H
OME
A
BOUT
U
S
Q
HSSE
&
P
OLICY
C
APABILITIES
Pipeline post- trenching
Post-trenching in Shore approach
Back-filling
Survey for Decomissioning
Cable burial
Pulling System
E
QUIPMENT
Pipeline post-trenching
Cable burial machines
Pulling Machine
Back-filling machine
O
UR
E
XPERIENCE
C
ONTACTS
Burial of cables and flexibles
MADE ISLAND, MYANMAR, BENGALA GULF
PROJECT
MYANMAR PROJECT
PRODUCT
OPTICAL CABLE
LENGTH (m)
4463
CLIENT/CONTRACTOR
PUNJ LLOYD/DHARTI DREDGING AND INFRASTRUCTURE LIMITED
YEAR
2012/2013
Progetto
Post-Trenching
MADE ISLAND, MYANMAR, BENGALA GULF
PROJECT
MYANMAR PROJECT
PRODUCT
40" - 32"
LENGTH (m)
9032
CLIENT/CONTRACTOR
PUNJ LLOYD/DHARTI DREDGING AND INFRASTRUCTURE LIMITED
YEAR
2012/2013
Progetto